AMC serves to provide a functional and stable environment for smart productions

Benchmarked against the Industry 4.0 model, the Advanced Manufacturing Centre (AMC) situated in the 75-hectare Tseung Kwan O INNOPARK serves to support re-industrialisation and commercialisation of innovations in Hong Kong. It is a pilot project showcasing how the design and development of an industrial building respond to the emerging trends of smart factories in a multi-storey environment for tenants from different industries, such as medical and biomedical engineering; smart electronics and optical equipment; semiconductor; and robo-electronics. AMC provides a gross floor area of over 1.1 million square feet with smart production technologies and comprehensive services for industrialists to turn innovative ideas into quality products.

The design concept is based on the idea of advanced manufacturing. With large footprint, high headroom, high loading capacity and wide structural span, the building can accommodate various scales of production units. A modular design with great flexibility and high building specifications was adopted for diversified uses, including pilot production with prototypes, scalable production and heavy production.

DESIGN AND CONSTRUCTION EFFICIENCIES
Building Information Modelling (BIM) was applied in full scale to develop a digital twin model in facilitating the design process and construction sequencing. Site safety issues were anticipated and precautionary measures could be taken in advance. Throughout the construction process, a variety of digital applications were also deployed to enhance building efficiency, such as augmented reality; visualisation; artificial intelligence; sensor technology; mobile applications for digitalised workflow; and BIM 5D payment. Besides, AMC is the first project in Hong Kong to adopt a battery-powered energy storage system to replace diesel generators, which supplied greener energy for tower cranes and contributed to 84 per cent of carbon reduction for each tower crane, maintaining a safe building environment with less air and noise pollution. 


This is an excerpt. The original article is published in Construction+ Q2 2022 Issue: Technology & Innovation.
Get the print magazine or subscribe to the digital edition to read the complete article.

PROJECT DATA
Project Name
Advanced Manufacturing Centre
Location
Tseung Kwan O INNOPARK, Hong Kong
Completion Date
April 2022
Site Area
27,145 square metres
Gross Floor Area
108,580 square metres
Building Height
90 metres
Client
Hong Kong Science and Technology Parks Corporation
Lead Architectural Consultant
Wong Tung & Partners Ltd.
Industrial Architectural Consultant
Nikken Sekkei Ltd.
Interior Designer
Wong Tung & Partners Ltd.
Civil & Structural Engineer
Meinhardt (C&S) Limited
Mechanical & Electrical Engineer
Wong & Ouyang (Building Services) Ltd.
Quantity Surveyor
Rider Levett Bucknall Ltd.
Landscape Architect
ADI Ltd.
Façade Consultant
Inhabit Asia Ltd.
ICT & Acoustic Consultant
Shen Milsom & Wilke Ltd.
Sustainable Design Consultant
Ramboll Environ (HK) Ltd.
Traffic Consultant
MVA (HK) Ltd.
BIM Consultant
Build.IT Ltd.
Graphic & Signage Consultant
VL Design & Consulting Ltd.
Lighting Consultant
Steensen Varming Ltd.
Main Contractor
Gammon Construction Limited
Images
Wong Tung and Partners Ltd.; Hong Kong Science and Technology Parks Corporation

yasbetir1.xyz winbet-bet.com 1kickbet1.com 1xbet-ir1.xyz hattrickbet1.com 4shart.com manotobet.net hazaratir.com takbetir2.xyz 1betcart.com betforwardperir.xyz alvinbet.help/ ritzobet.org betforward.com.co betforward.help betfa.cam 2betboro.com 1xbete.org 1xbett.bet romabet.cam megapari.cam mahbet.cam وان ایکس بت بت فوروارد