PROJECTS

Seletar Airport

Arrival seating area
Arrival seating area

The Seletar Passenger Terminal Building features a partial two-storey building with adjacent departure and arrival halls, a central courtyard and a dedicated business aviation centre. Spanning a gross floor area of 10,000 square metres, the terminal is planned with a handling capacity of 0.7 million passengers per annum.

The passenger terminal features three new aircraft stands situated in front of the terminal building to provide passengers quick and efficient aircraft access. The apron is designed to accommodate aircraft types of up to ATR72 size. Larger flights, if needed, can be facilitated by bussing passengers to/from remote aircraft stands.


To read the complete article, register your details above
to be notified once the revamped Construction Plus App is ready!

PROJECT DATA
Project Name: Seletar Airport
Location: 21 Seletar Aerospace Road 1, Singapore
Completion Date: April 2018
Site Area: 25,000 square metres
Gross Floor Area: 10,000 square metres
Building Height: 2 storeys
Owner: Civil Aviation Authority of Singapore (CAAS)
Operator: Changi Airport Group (Singapore) Pte Ltd
Architecture Firm:  3HPArchitects Pte Ltd
Principal Architect: Chng Beng Guan
Civil & Structural Engineer: Surbana Jurong Consultants Private Limited
MEP Engineer:  GIMS & Associates Pte Ltd
Quantity Surveyor:  Surbana Jurong Consultants Private Limited
Main Contractor: Takenaka Singapore Pte Ltd
Interior Fit-Out Contractor:  Tat Wai Enterprise Pte Ltd
Images: Changi Airport Group (Singapore) Pte Ltd